Details
Bonds bogie LMS Side Corridor Coaches:
1st, 2nd and 3rd, constructed in metal, in Bassett-Lowke boxes, circa 1948 (G) (3)
1st, 2nd and 3rd, constructed in metal, in Bassett-Lowke boxes, circa 1948 (G) (3)