.jpg?w=1)
Details
Scratch-built 0 Gauge four LMS bogie corridor coaches
possibly modified Bonds or CCW kit built, one central gangway 3rd in late 1930s livery, one 1st 3rd side corridor, a 1st side corridor and centre gangway lavatory combination, all 43cm. (17in.) and a kitchen car 38cm. (15in.) long, all three in painted 1930s elaborate livery, all in LMS line lake (F-G) (4)
possibly modified Bonds or CCW kit built, one central gangway 3rd in late 1930s livery, one 1st 3rd side corridor, a 1st side corridor and centre gangway lavatory combination, all 43cm. (17in.) and a kitchen car 38cm. (15in.) long, all three in painted 1930s elaborate livery, all in LMS line lake (F-G) (4)
Special notice
No VAT will be charged on the hammer price, but VAT at 17.5% will be added to the buyer's premium which is invoiced on a VAT inclusive basis