細節
An Orenstein & Koppel Rack and Adhesion 0-4-0 Well and Side Tank Locomotive
7¼in. gauge finely engineered by D.J. Bussey to designs by K. Swan with silver soldered copper boiler stamped N86 80 90, with fittings including water gauge with shield and shut-off valve, pressure gauge, manifold with blower, injector, whistle and steam brake valves, clack valves with shut-off cocks and blowdown valve. Chassis details include twin outside cylinders with Walschaert's valve gear, mechanical lubricator, foot plate controlled draincocks, crankshaft spur gear and jackshaft driven coupled axles and rack drive gear with steam operated clutch to disengage the drive train, crosshead driven feed pump and by-pass with pressure relief valve, injector, whistle, steam and hand operated brake gear and hand operated crankshaft band brake, adjustable damper, sanding gear, riveting, steps, hand and lamp irons and many other details. Finished in green, black and red -- 31¼ x 43in. (79.5 x 119cm.); detailed album of photographs taken during construction, drawings, instructions and boiler certificate valid to 5.4.96
7¼in. gauge finely engineered by D.J. Bussey to designs by K. Swan with silver soldered copper boiler stamped N86 80 90, with fittings including water gauge with shield and shut-off valve, pressure gauge, manifold with blower, injector, whistle and steam brake valves, clack valves with shut-off cocks and blowdown valve. Chassis details include twin outside cylinders with Walschaert's valve gear, mechanical lubricator, foot plate controlled draincocks, crankshaft spur gear and jackshaft driven coupled axles and rack drive gear with steam operated clutch to disengage the drive train, crosshead driven feed pump and by-pass with pressure relief valve, injector, whistle, steam and hand operated brake gear and hand operated crankshaft band brake, adjustable damper, sanding gear, riveting, steps, hand and lamp irons and many other details. Finished in green, black and red -- 31¼ x 43in. (79.5 x 119cm.); detailed album of photographs taken during construction, drawings, instructions and boiler certificate valid to 5.4.96