No VAT will be charged on the hammer price, but VA…
顯示更多
THE THAMES TUNNEL OPENED THE 25 DAY OF MARCH 1843
細節
THE THAMES TUNNEL OPENED THE 25 DAY OF MARCH 1843
showing the two entrances with a two bore walking tunnel 1200 feet long, also shown in cross section with gallopping horses--15.5in. x 20in. (39cm. x 51cm.)
注意事項
No VAT will be charged on the hammer price, but VAT at 15% will be added to the buyer's premium which is invoiced on a VAT inclusive basis.
拍品專文
The Thames Tunnel was the first bored tunnel under a river. Construction started in 1825 and finished finally in 1843.